Please find here with a list of some of the contracting which we had executed:

  1. Constructions of residential 10 houses in the water purification plant in Basra according to contract number 20 5th of may 2001.
  2. Build up and perceptions of main concrete pounds connected to the pipeline (315mm) length of 11 Km on 17 October 2002.
  3. Maintenance of water purification plant in Faw distraction on 28 August 2002.
  4. Implementation of electrical and mechanical works and installation of pumps for pumping water in Basra Airport according to the contract number 19 on 17 October 2000.
  5. Sewage Basins were constructed at the Khor Al-Zubair sewer station 22 September 2000.
  6. Molding the bases of the transformer bases with the work of gaits to stone the water in the mains water station at Basra airport.
  7. Doing maintenance for the gates semere in sewage stations in Al-Hussain district contract No. 25 November 1998.
  8. Contraction the units of the water assembad in the Muhajran Qurna 25 November 1996.
  9. Contract the Concrete pounds of the ice plant of Saiba contract in 9 February 1998
  10. Implementation the works of the plants at water purification plant in Mohammed Al-Qasim in Al-Zubayr contract No. 564 – 28 November 1998.
  11. Developing and Re-construction of water station of Al-Shohada in Al-Shoaiba , Save Children organization.
  12. Processing of materials and casting contrabasses for the basis of collected water units.
  13. The creation of water units capacity of 1000 cubic meters in district of Abu Al-Kahasib.
  14. Construction of 40 concrete bridges and six bases for the directorate of Basra.
  15. Supply 500,000 liters of material for directorate of water and sewage in Basra.
  16. Preparation of building materials for the directorate of water of Basra.
  17. Processing of 1000000 liters of the substance of the mastic and Million of Flankot for the Nazem Shatt al- Basra project in 1993.
  18. Construction and paring of roads and paraments in multiple projects.
  19. Al-Zaytoon sewage web in Basra in 2003.
  20. Sewage web of Al-Moalimen and Al-Hussain neighborhood in Basra.
  21. Maintenance if Basra-Amara road in 2003.
  22. Reconstruction of the Shatt Al-Arab municipality building and health clinics in Basra.
  23. A contractor with W.H.O building in the governorate of Al-Emara.
  24. Contractor with I.O.M.
  25. The work of feces and prose for the building of child hospital in Basra for the benefit of the company S.R.G.
  26. Flatting works with an area of 200000 square meter for the child’s hospital project in Basra.
  27. Works and construction with blocks for the project of child’s hospital in Basra.
  28. Construction casting works 1850 m3 in the project in Basra.
  29. Ceramic finishing works in the children’s hospital project in Basra.
  30. A project for planting gardens in Haritha area for the year 2004.
  31. A project for cleaning the area of Haritha for the year 2004.
  32. Project of tiling street of Al-Haritha area contractor No. Three 2004.
  33. Water networks projects in Haritha area contractor No. 9 for the year 2004.
  34. Street project for the religion school’s street contractor No. 16 year 2005.
  35. Clearing works project for Al-Haritha area contractor No. 85 year 2006.
  36. Clearing works project for Al-Faw municipality contractor No. 89 in 2006.
  37. Soil works in the Al-Bahar Area in Faw construction No. 30 in 2007.
  38. Setting up for rows on the fourth island construction No. 19 in 2008.
  39. Soil works and constructions of umbrellas in the Thagor area contractor No. 28 of 2008.
  40. Rehabilitation of Al-Quds street in Um Qassr contractor No. 11 for 2008.
  41. Covering the streets of Al-Mooder with the Masonry Bricks with establishing surface sewer networks contractor No. 80 for 2008.
  42. Processing and installation of Solar cells in the rotational training institute contractor No.48 in 2009.
  43. The Development of 33 KV Feeders from the Bakr Station to the Rafidiyah Station
  44. Preparing and implementing materials for the purpose of improving and developing the electrical network in the area of ezzedine selim and its marshes.
  45. pillars and concrete works for the project of establishing integrated river taxi station